About the project
Lateral One is a low-rise apartment building by Grand Signature in Dubailand Residence Complex (DLRC), part of Dubailand in Dubai. It holds 38 apartments on three residential floors, above a ground floor of shops and the car park entrance, with a landscaped rooftop on top. The facade sets light surfaces against darker textured panels. Grand Signature came to development from construction, fit-out and interior work, and it says it wants to give Dubai affordable luxury that is more than just affordable. Completion is planned for Q4 2027.
The residences
The mix is 10 studios, 19 one-bedroom and 9 two-bedroom apartments, and some of the two-bedroom layouts add a maid's room. On the current unit list, studios start from about 682 sq ft, one-bedroom apartments from 851 sq ft and two-bedroom apartments from 1,649 sq ft. Interiors are minimalist in beige, brown and cream, and the bedrooms get daylight through large floor-to-ceiling windows. Kitchens have quality countertops and modern appliances. Every apartment is smart home ready, with the wiring in place to add smart home systems later.
Amenities
Residents share a swimming pool with a deck and cabanas, an outdoor gym, a yoga and meditation area, a Zen garden, a sunken seating area, a barbecue area and a children's play area. The landscaped rooftop has a jogging track. Shops on the ground floor cover small daily errands, and the building uses energy-efficient lighting and water-saving fixtures.
Location and payment plan
DLRC lies close to Sheikh Mohammed Bin Zayed Road. By car, Silicon Oasis Mall is about 10 minutes away, IMG Worlds of Adventure about 15 minutes and Dubai International Airport about 25 minutes. Lateral One is sold on a 76/24 plan: 20% on booking, 30% in instalments during construction from October 2026, 26% on handover in December 2027, and the remaining 24% spread over the two years after handover, until December 2029.
Direct-to-developer access via Palmera — no buyer commission, full Palmera support from selection through handover, in your language.
Unit types
| Type | Beds | Size | Price |
|---|---|---|---|
| Studio | — | 682 sqft | 993,212 AED |
| 1BR | 1 | 851 sqft | 1,150,676 AED |
| 2BR | 2 | 1,649 sqft | 2,058,780 AED |
Payment plan
| Stage | % | Milestone |
|---|---|---|
| Down payment | 20% | On booking |
| During construction | 30% | October 2026 to November 2027 |
| On handover | 26% | December 2027 |
| After handover | 24% | January 2028 to December 2029 |
The developer
About Dubailand
Dubai's largest master-planned district — affordable entry, strong yields.
What's nearby
Frequently Asked Questions about Grand Signature Lateral One
Who is the developer of Lateral One?
Where is Lateral One located?
What types of apartments are there at Lateral One?
How large are the apartments at Lateral One?
When will Lateral One be completed?
What is the payment plan for Lateral One?
What amenities does Lateral One offer?
How many floors does Lateral One have?
A personal advisor will get back to you.
Within 3 business hours you'll receive a full briefing on Grand Signature Lateral One in Dubailand, Dubai — floor plans, payment schedule, ROI projection, and the full amenity list — as a single PDF.




